{"id":4115,"date":"2023-03-13T16:53:51","date_gmt":"2023-03-13T15:53:51","guid":{"rendered":"https:\/\/gazwoda.pl\/doi-10-15199-17-2023-3-5\/"},"modified":"2024-06-13T18:30:02","modified_gmt":"2024-06-13T16:30:02","slug":"doi-10-15199-17-2023-3-5","status":"publish","type":"post","link":"https:\/\/gazwoda.pl\/en\/doi-10-15199-17-2023-3-5\/","title":{"rendered":"DOI: 10.15199\/17.2023.3.5"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">The financial aspect of local rainwater management on a wind farm <\/h2>\n\n<p><em>Maciej Sawicki, Ma\u0142gorzata Iwanek<\/em><\/p>\n\n<p>DOI: 10.15199\/17.2023.3.5, <strong>March 2023<\/strong><\/p>\n\n<p><a href=\"https:\/\/gazwoda.pl\/wp-content\/uploads\/Openaccess\/2023\/101519917202335.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" target=\"_blank\">Download PDF<\/a><\/p>\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n","protected":false},"excerpt":{"rendered":"<p>The financial aspect of local rainwater management on a wind farm Maciej Sawicki, Ma\u0142gorzata Iwanek DOI: 10.15199\/17.2023.3.5, March 2023 Download PDF<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27,390],"tags":[1387,1383,1384,1386,1385],"class_list":["post-4115","post","type-post","status-publish","format-standard","hentry","category-27","category-2023-en","tag-absorption-well","tag-local-management-of-rainwater","tag-profitability-analysis","tag-seepage-boxes","tag-wind-power-plant"],"_links":{"self":[{"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/posts\/4115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/comments?post=4115"}],"version-history":[{"count":0,"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/posts\/4115\/revisions"}],"wp:attachment":[{"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/media?parent=4115"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/categories?post=4115"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/tags?post=4115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}