{"id":2931,"date":"2021-09-06T20:11:44","date_gmt":"2021-09-06T18:11:44","guid":{"rendered":"https:\/\/gazwoda.pl\/doi-10-15199-17-2021-9-2\/"},"modified":"2024-06-13T18:30:17","modified_gmt":"2024-06-13T16:30:17","slug":"doi-10-15199-17-2021-9-2","status":"publish","type":"post","link":"https:\/\/gazwoda.pl\/en\/doi-10-15199-17-2021-9-2\/","title":{"rendered":"DOI: 10.15199\/17.2021.9.2"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">The purpose of using BIM in the design of water and sewage systems for small buildings<\/h2>\n\n<p><em>Ewa Badowska, Dawid Bandzierz, Szymon Dryga\u0142a<\/em><\/p>\n\n<p>DOI: 10.15199\/17.2021.9.2, <strong>September 2021<\/strong><\/p>\n\n<p><a href=\"https:\/\/gazwoda.pl\/wp-content\/uploads\/Openaccess\/2021\/101519917202192.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" target=\"_blank\">Download PDF<\/a><\/p>\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n","protected":false},"excerpt":{"rendered":"<p>The purpose of using BIM in the design of water and sewage systems for small buildings Ewa Badowska, Dawid Bandzierz, Szymon Dryga\u0142a DOI: 10.15199\/17.2021.9.2, September 2021 Download PDF<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,28],"tags":[90,92,91],"class_list":["post-2931","post","type-post","status-publish","format-standard","hentry","category-26","category-2021-en","tag-bim-en","tag-plumbing","tag-single-family-house"],"_links":{"self":[{"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/posts\/2931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/comments?post=2931"}],"version-history":[{"count":0,"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/posts\/2931\/revisions"}],"wp:attachment":[{"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/media?parent=2931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/categories?post=2931"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gazwoda.pl\/en\/wp-json\/wp\/v2\/tags?post=2931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}